Work Experience at 'Kristal Systems':

Date of Joining: 15th-May-2009 

Associated duration : 6 Months

                                                                                            Kristal Systems - Chennai, was where I started my professional venture as a Trainee - Electrical Engineer. I had the opportunity of  working in Industrial Electrification and Substation projects. I learnt the basic lessons of design engineering, from using the auto-CAD software to the basic facts about Switchyards' from Kristal Systems. I had been associated with Kristal Systems for six months.


Work Experience at 'Spark Consultants and Engineers':

Date of Joining: 15th-October-2009 

Associated duration : 1 Year and 2 Months

                                                                                             It was not a different experience at all for me at Spark Consultants and Engineers. Owing to the changes in the management, Kristal Systems was renamed as Spark Consultants and Engineers. I got a very fruitful exposure to the basic concepts of switchyard designing. Being engaged with preparation of drawings and calculations associated with substation designing and industrial plants, was certainly an accumulating asset in my profile. For the next 14 months that followed,  I had a vital exposure in design concepts. 


Work Experience at 'Larsen and Toubro Ltd':

Date of Joining: 1oth-December-2010 

Associated duration : till date...

                                                                                              'Larsen and Toubro' - The name says it all... The pride that I have, considering that I am associated with one of the leading organisation is inexplicable. My job responsibilities included preparation of design drawings for Traction Substation and Traction Switching Station. This experience helped me gaining knowledge in Traction - Power Supply Installation design concepts and the standards of Research Design and Standards Organisation.


 Professional Summary 

I was involved in the design and drawings for  66kV (Industrial) 33-132-220 kV Substations for PGCIL, MSETCL and other clients. Upon accomplishment of various tasks in several projects handled perceived clear perspectives on:


Electrical Basic Engineering:                                                        Electrical Installation Drawings:

$ Earthing Design.                                                                                                    $ Cable Routing Layout

$ Illumination Design.                                                                                           $ Earthing Layout

$ Foundation Design/Stability calculation.                                                 $ Lightning Protection Layout

                                                                                                                                          $ Lighting Layout

                                                                                                                                          $ Trench and Foundation Layout

                                                                                                                                          $ Electrical Clearance Layout

Electrical Design Calculations:                                                                          Computer Skills:

$ Cable sizing calculation                                                                                     $ Auto-CAD

$ Short Circuit force calculation                                                                       $ Photolux, Dialux, CG Lux

$ Voltage Drop calculation                                                                                   $ MS office tools

$ DSLP calculation

$ CT-PT burden calculation

Make a free website with Yola